Monday 28 July 2014


Three warehouses all connected shared by pedestrians and fork trucks,

 First Job send in the blasting machine to outline a mile and half of walkways
 Then get the team to install anti skid areas in door ways



 All walk ways in blue solvent free high build epoxy with yellow epoxy border lines


 Black and white crossings to protect pedestrians when crossing over

 with these lads and their dedication to the job we give more than 100% every time

No comments:

Post a Comment